Dams
and Energy Structures
Dam Projects
Construction of 7 dams for irrigation and security purposes has been completed.
HES Projects
A total of 8 hydroelectric power plant (HEPP) projects, including dams and regulators, have been completed.
Natural Gas Combined Cycle Power Plant Projects
1 NGCCPP Project, an AGE Investment, was completed.
Throughout our activity life within the scope of Dam and Energy works:
-
We have completed 16 projects amounting to USD 1,510,000,000 .
-
Total Installed Power of the HEPP Projects we have completed: 796 MW.
-
The total installed capacity of the completed NGCCPP project is 205 MW.
-
The total installed capacity of the energy projects we have committed to is 1,001 MW.
Agricultural Irrigation
Within the scope of Agricultural Irrigation Projects, AGE Construction has completed 23 projects with a total cost of USD 731,500,000 and a total irrigation area of 167,541 hectares.
The total irrigated area of our 3 ongoing projects is 24,973 hectares.
Infrastructure Projects
Within the scope of infrastructure works
- Drinking Water
- Sewerage,
- Landscaping and
- Our projects for Oil Lines are included.
In this context, as AGE Construction, we have completed and realized 11 projects amounting to 135,400,000 USD during our activity period. In total, 525,957 m of pipes of various diameters and types were laid and 8 tanks with a total capacity of 100,000 m³ were constructed.
We currently have 1 project in progress amounting to USD 13,600,000.
Superstructure Projects
To date, AGE Construction has completed and realized 59 superstructure projects amounting to USD 553,100,000 . A total of 1,366,514 m² closed area has been constructed with these completed projects.
Transportation Projects
AGE Construction has completed 2 projects with 47.5 km of highway and 1 project with 3,235 m of metro line.
Another project completed within the framework of our transportation projects is the Sulaymaniyah Airport with a Terminal Building with an annual passenger capacity of 1,000,000.
The monetary equivalent of our completed works is 101,100,000 USD.
With our 2 ongoing projects, a total of 38,000 meters of railway tunnels are being constructed in the Himalayan Belt. The total value of our ongoing projects is 360,000,000 USD.