Fethiye Hepp Client: FETAŞ (Fethiye Energy And Trading Inc.) PROJECT LOCATION MUGLA – TURKEY CLIENT FETAŞ (FETHIYE ENERGY AND TRADE INC.) Type Of Damm Weir Damm Height 85 m Backfill Volume 8,000,000 m3 Concrete Volume 40,000 m3 Installed Capacity 16,5 MW Date: 16 September 2024 Category: Baraj & Enerji Projeleri Share